Home
Call For Papers
Submission
Author
Registration
Publications
About
Contact Us

  PLC Based Leak Test Machine for Shock Absorber Tube- A Survey  
  Authors : Ganesh Attarde; Lalit Rahane; Sunny Bhavsar; Nikhil Jejurkar; Somesh Dhande
  Cite as:

 

Leak testing machine is a special purpose machine and it will be specially design and manufacture to observation and analysis of minor leaks in shock absorber tube which is Automotive Component. Now a days user observation and checking method is manual i.e. operator is visually checks tubes. Because of this there are some field concerns find in shock absorber and due to this reason they need some special machine to carry out this operation. This machine is a combination of electronics, electrical and pneumatic like PLC, SMPS, single filters, MCB’s, solenoid valves, pneumatic cylinder, air FRL unit, air buster, digital pressure, switches, reed switch sensor, optical sensor, push buttons, indication lamps, digital counter, etc. Basically operating system for this machine will be as; Lock shock absorber tube by using push button i. e. cycle start then feel air in shock absorber tube for reset time. Then cut air supply now check air drop by using feedback system through digital procedure switch. If the tube is leak then the pressure will be drop and digital pressure switch gives digital input in PLC. According to PLC program logic PLC gives result output with indications either the tube is leak or not and this will insure the rejection of tube from in field.

 

Published In : IJCSN Journal Volume 5, Issue 6

Date of Publication : December 2016

Pages : 930-933

Figures :02

Tables : 01

 

Ganesh Attarde : working as assistant professor in Sandip Institute of Technology and research centre, Nashik having around 10 years of teaching experience. His are of interest is embedded systems. He has published around 10 international journal papers.

Lalit Rahane : studying in Sandip Institute of Technology and research centre, Nashik in final year degree course in Electronics and Telecommunication. They are doing their research in PLC based systems.

Nikhil Jejurkar : studying in Sandip Institute of Technology and research centre, Nashik in final year degree course in Electronics and Telecommunication. They are doing their research in PLC based systems.

Somesh Dhande : studying in Sandip Institute of Technology and research centre, Nashik in final year degree course in Electronics and Telecommunication. They are doing their research in PLC based systems.

Sunny Bavsar : studying in Sandip Institute of Technology and research centre, Nashik in final year degree course in Electronics and Telecommunication. They are doing their research in PLC based systems.

 

 

 

 

 

 

 

PLC, Shock Absorber Tube, Leak Test, FQA

Due to manual testing the system is less accurate and also takes time. At the final FQA it is found the tubes have leakage and rejected by FQA to remove/replace the tube. The aim of the project was to address the pressing challenges of increase production rate with more accurately and efficient operation of Leak testing machine. Leak testing machine is a special purpose machine and it will be specially design and manufacture to observation and analysis of minor leaks in shock absorber tube in which we increase the production rate. If any failure occurred in hardware then work done can carried out manually. As shown in Table 1, we come across the difficult parameter of tube testing and we obtained solution upon it. Hence we achieve all our objectives and overcome all the drawbacks we have seen in trial and error experiment.

 

[1] John R. Hackworth, Frederick D., Hackworth Jr., “PLC’s Programming Methods and Applications”, PHI Publishers, 2003 [2] Pneumatics Basic Level, Festo Didactic , 2002 [3] Hydraulics, Festo Didactic , 2002 [4] Process control and Instrument technology, C.D.Johnson, Pearson, 2006. [5] Gosavi, Bhagyashree R; Attarde, Ganesh; Patil, Dattatray A; ,Structural Live Load Monitoring,International Journal of Advanced Electronics and Communication Systems,,,,2014.